I-80 Quealy Dome West Laramie, 282-292 | I805177 | Steve Cook 307-760-2595
| Simon Contractors and Subsidiaries Cheyenne, WY 307-632-7900 | 2020-Oct-20 | 2022-Oct-30 | Temporary Concrete Barriers that will be shifted to accommodate the lane closure change. Speed reductions will be set to 45 mph and will be accompanied by flaggers at each of the bridge locations. The Driving Lanes in both the EB and WB directions have been paved with 1.5 inch overlay. at each of the structures near RM 288.62, 285.09 and 290.44, the re are temporary asphalt ramps installed, which will lower the interstate speed to 45 mph when traffic will be switched from the passing lane to the newly placed driving lane. The estimated date for lane switch could change, but is the week of Aug 9-14 of 2021. | | 282.65 to 291.46 | Paved | Construction zone speed limit 45 MPH Right lane closed | Aug 03, 2021 06:49 am |
Rock Springs - Rawlins (Rock Springs East (WBL) | NHPPI-I802204 | Brad McCullough 352-3036(c) 522-8948
| Interstate Highway Construction, Inc. Englewood, CO 303-790-9100 | 2021-Mar-08 | 2021-Nov-30 | A width restriction of 16 feet is in effect throughout the project. | | 105.5 to 120.5 | Paved | Construction zone speed limit 65 MPH | Oct 05, 2021 09:07 pm |
I-80 MP 310-313 Bridge Rehabilitation | I805175 | Kory Cramer 307-745-2137
| Reiman Corp. and Subsidiary Cheyenne, WY 307-632-8971 | 2021-Mar-29 | 2021-Oct-31 | Bituminous pavement surfacing, high performance wearing course, concrete slab replacement, sealing joints, bridge rehabilitation and miscellaneous work on approximately 3.9 miles of I-80 beginning at the intersection of Third St and Curtis in Laramie. | | 310 to 313 | Paved | Expect delays | Oct 12, 2021 11:27 am |
Rock Springs Streets (I-80 Interchange/Interchange Road) | INFRA-I802220, STPU-RO-B123014, & ARSCT-B123A0 | Brad McCullough 352-3036(c) 522-8948
| Reiman Corp. and Subsidiary Cheyenne, WY 307-632-8971 | 2021-Mar-08 | 2023-Jun-30 | Construction of a new I-80 interchange at MP 101.16 and new connector from I-80 to Blairtown Road (Sweetwater County Road 51). New structures and concrete/asphalt surfacing will be constructed through the duration of the project. A width restriction of 16 feet is in effect throughout the project. Expect closures at the Sunset Interchange. | | 99.5 to 102.5 | Paved | Construction zone speed limit 65 MPH | Oct 06, 2021 07:46 am |
I-80 Fort Steele to Laramie, 250-253 and 282-279 | I804271 | Aaron Spenny 328-4104 or 321-6517
| Simon Contractors and Subsidiaries Cheyenne, WY 307-632-7900 | 2020-Oct-20 | 2022-Oct-30 | I-80 Winter Freight project will bring nearly 100 new semitruck parking spaces to both the Fort Steele Rest Area about 7 miles east of Sinclair (mile marker 228) and at the Quealy Dome truck parking area 20 miles west of Laramie (mm 290) for a total of almost 200 new spaces. Additionally, semitruck climbing lanes will be installed on 2 miles of I-80 eastbound over Halleck Ridge (about 8 miles west of Elk Mountain, between mm 250.5-252.5) and about 2 miles of I-80 westbound between Cooper Cove and Quealy Dome (mm 279.5-281.5) near the Albany County line. Motorists on I-80 between Laramie and Rawlins will see minimal impacts. The Fort Steele Rest Area will remain closed during I-80 Winter Freight project construction. Please do not park on the on- and off-ramps of the interstate as it will potentially impede work in the area. There will be some short lane closures in the east bound lane around RM 251 to RM 253 | | 227.9 to 228 | Paved | None | Aug 18, 2021 06:29 am |
| 250.5 to 252.5 | Paved | Aug 18, 2021 06:29 am |
| 279.5 to 281.5 | Paved | Expect delays | Aug 18, 2021 06:29 am |
I-80mp 372-382 Hillsdale Bridge Replacement | NHPPI-I806209 | Kevin Erickson 3076318322 [email protected] | Simon Contractors and Subsidiaries Cheyenne, WY 307-632-7900 | 2020-Apr-27 | 2021-Oct-31 | Grading, draining, placing crushed base and bituminous pavement surfacing, plant mix wearing course, removal and replacement of two bridges , bridge rehabilitations and miscellaneous work on approximately 9.8 miles of I-80.The demolition work is focused on the eastbound structures on I-80 and is expected to take place at night, This work will take place overnight, from about 9 p.m. Wednesday to 5 a.m. Thursday at Exit 377. The crane used to complete this work will be stationed on County Road 140/Stuckey Road, which means crews will need to close the county road overnight Wednesday night. A detour will be in place to reroute travelers. Current traffic control measures along mile markers 372-382 of I-80 � including head-to-head lanes, reduced speed limits and flaggers, among others � will continue to be in place during this work. Motorists through the work zone should stay alert, expect delays and be prepared to slow down. | | 372 to 382 | Paved | Expect delays | Sep 27, 2021 08:35 am |
I805175 | 2021-Apr-05 | 2021-Oct-31 | | 309.93 to 313.83 | Paved | None | Apr 07, 2021 11:16 am |
I-80 WB mp 6 to 5 road work in driving lane | B213030 | Damon Newsome 307-783-6801
| 2021-Jul-06 | 2021-Oct-31 | Various bridge rehabilitation work on the bridge at I-80 WB mp 6 to 5. | | 5 to 6 | Paved | Expect delays Left lane closed | Sep 01, 2021 11:54 am |
I-80 EB mp 235-235.5 | WYDOT repair | 2021-Oct-13 | 2021-Oct-20 | Pothole repair I-80 mp 235.5. Right lane is closed. | | 235 to 235.5 | Paved | Right lane closed | Oct 14, 2021 06:06 am |
I-80 mp 252-258 Paving Elk Mountain | I-80elkmountainroadwork | Aaron Spenny 328-4104 or 321-6517
| Knife River Corporation and subsidiaries Sioux City, IA 712-252-2766 | 2021-May-24 | 2021-Oct-31 | Paving and miscellaneous roadwork on approximately 6 miles of I-80. Onsite Traffic Control Maintainer (701) 400 - 8108 | | 252 to 258 | Paved, Milled | Expect delays | Jun 28, 2021 08:46 am |
Mechanical Surface Removal | AV-11995817 | Damon Newsome 307-783-6801
| Coldwater Group Inc , 801-745-7091 | 2021-Apr-14 | 2022-Jul-31 | Various bridge rehabilitation work on the bridge at mp 97 on I-80 EB and WY 374 mp 83. | | 96.95 to 97.05 | Paved | Aug 10, 2021 04:31 pm |